论文部分内容阅读
德兴选矿厂规模要求从现有选矿厂(一选厂)日处理矿石能力增加一倍。经设计比较确定在冷坑新建一座日处理矿石能力与一选厂相同的二选厂。在二选厂设计中充分考虑了一选厂生产中积累的经验和国内外科研单位对德兴铜矿矿石所进行的试验研究成果,并对福陆公司的大厂设计进行了仔细研究,吸取他们的先进技术和方法。同时,对主要环节都进行了方案比较,所推荐的方案尽量符合我国的国情,力求先进
The scale of the Dexing concentrator requires doubling the capacity to process the ore from the existing concentrator (a beneficiation plant). After the design comparison, it is confirmed that a new second processing plant capable of processing ore with the same processing capacity as the first processing plant in the cold pit will be established. In the second plant design fully consider the experience of a selected plant production and domestic and foreign scientific research units of Dexing copper ore carried out by the experimental research results, and Fluor’s big factory design was carefully studied, to learn Their advanced technology and methods. At the same time, all the major aspects of the program are compared, the proposed program as far as possible in line with China’s national conditions and strive to advanced