论文部分内容阅读
所谓工程变更,在FIDIC条款中被定义为设计文件或技术规范个性而引起的合同变更。而本文中所要论述的工程变更,以及其出于业主角度、作为一种“技术”应用于工程管理之中的作用,更多的却不是强调其作为被动的、弥补过失性的技术更改行为,更不是讨论恐其带来的经济方面的单纯支出增加而进行的
So-called engineering changes, which are defined in the FIDIC clauses as contractual changes arising from the design document or the technical personality. The engineering changes to be discussed in this article, and their role as a “technology” in project management from the point of view of the owner, are not more emphasized as technical changes that are passive and make up for negligence Not to discuss the increase in the simple economic expenditure that it has brought about