溪洛渡水电站自2003年8月前期筹建工程开工以来,历经参建各方7年多的建设,目前大坝最大上升高程达416m,最大高度约91m,大坝混凝土已浇筑约110万m3,坝体接缝
Since the construction of the Xiluodu Hydropower Station was started in August 2003, more than seven years have passed since the construction of the Xiluodu Hydropower Station. At present, the maximum elevation of the dam reaches 416m and the maximum height is about 91m. The concrete of the dam has been poured to about 1.1 million m3. The dam body seam