论文探讨了沥青冷再生的设备配置及其施工工艺。提出了配套的就地冷再生设备的构成,给出了沥青冷再生混合料的配合比设计要求,以及乳化沥青冷再生混合料配合比的设计流程,并进行了具体的配合比设计的试验验证。对乳化沥青冷再生基层的施工工艺及质量控制进行了分析,给出了乳化沥青冷再生混合料试验控制要求和现场检测项目。
The dissertation discusses the equipment configuration of cold recycling asphalt and its construction technology. The composing of on-site cold regeneration equipment is put forward. The design requirements of mixture ratio of asphalt cold recycled mixture and the design flow of mixture ratio of emulsified asphalt cold recycled mixture are given. The test of concrete mix design is carried out . The construction technology and quality control of emulsified asphalt cold reclaimed grass base were analyzed, and the test control requirements and field test items of emulsified asphalt cold reclaimed mixture were given.