论文部分内容阅读
设计概算是设计文件的重要组成部分,是由设计单位根据初步设计图纸及说明、概算定额(或概算指标)、各项费用定额或取费标准(指标)、设备材料预算价格等资料,编制和确定的建设项目从筹建至竣工交付使用所需全部费用的文件。经批准的建设项目设计总概算的投资额,是该工程建设投资的最高限额,在工程建设过程中,年度固定资产投资计划安排、银行拨款或贷款、施工图设计及其预算、竣工决算等,未经按规定的程序批准,都不能突破这一限额,以确保国家固定资产投资计划的严格执行和有效控制。
The design estimate is an important part of the design document and is prepared by the design agency according to the preliminary design drawings and specifications, the estimated quota (or estimated estimate index), the fixed expense or expense standard (index), the equipment material budget price and other information Determine the construction project from the preparation to the completion of the delivery of the full cost of using the required documents. The approved total amount of investment in the design of construction projects is the maximum amount of construction investment. During the process of project construction, the annual investment plan of fixed assets, bank grants or loans, the design of construction drawings and their budgets, the final accounts, etc., Without the approval of the prescribed procedures, these limits should not be exceeded to ensure the strict implementation and effective control of the state’s fixed assets investment plan.