论文部分内容阅读
东江水电站位于湘江支流耒水的上游。大坝采用双曲拱坝坝堤,底宽35米,顶宽7米,高157米。大坝建成后,水库可蓄水81亿立方米。坝后式厂房,将安装四台水轮发电机组,单机容量12.5万千瓦。第一台机组预计1986年发电,整个电站建成后,每年可发电13.2亿
Dongjiang Hydropower Station is located in the upper reaches of the tributary of the Xijiang River. Dam using double curved arch dam, at the end of 35 meters wide, top width of 7 meters, 157 meters high. After the completion of the dam, the reservoir can store 8.1 billion cubic meters. Dam-style plant, will install four hydro-generating units, stand-alone capacity of 125,000 kilowatts. The first unit is expected to generate electricity in 1986, the entire power station is completed, the annual power generation can be 1.32 billion