论文部分内容阅读
为压缩柳州南站的货车中转停留时间、提高车站运输效率,分别从列车出发正点情况、技术设备能力、列车到发均衡度方面,分析柳州南站中时的影响因素,并提出压缩中时的对策,包括提高出发列车正点率,提高技术设备能力,提高计划质量,加强运输指标分析等措施。
In order to reduce the transit time of trucks in Liuzhou South Station and improve the efficiency of station transportation, the paper analyzes the influencing factors of Liuzhou South Railway Station in terms of train starting point, technical equipment capability and train arrival balance, Measures include measures to improve the punctuality rate of departure trains, increase the capacity of technical equipment, improve the quality of plans, and strengthen the analysis of transport indicators.