本篇论文主要是通过对安康市高新七路下穿阳安铁线K349+6902-13米钢筋砼框架桥工程施工方案的分析,制定详细的施工方案,采用现场预制,架空顶进的施工方式,保证铁路路基安全,确保工程质量和施工安全,把该工程建成优质工程作为努力方向。
This paper is mainly through the analysis of the construction scheme of K349 + 6902-13m reinforced concrete frame bridge under the Ankang Hi-tech 7 Road under the Yang’an line, to develop a detailed construction program, the use of on-site prefabricated, overhead jacking construction methods , To ensure the safety of railway subgrade, to ensure the quality of the project and construction safety, the project into a quality project as a direction.