11月17日,中建三局“基于BIM的带异形连桥超高层钢框架—支撑结构建造技术的研究与应用”经湖北省住房和城乡建设厅鉴定,总体达到国内领先水平,其中基于BIM的可视化与结构模拟分析相结合的应用达到国际先进水平。该成果通过BIM的可视化将钢连桥施工全过程的数值模拟及不同工况进行受力分析,提供施工方案的优化与控制决策,结合现场实测数据,形成了基于“三位一体施工过程控制”的异型钢连桥建造技术,解决了超高层异形钢连桥建造技术难题。同时,在理论分析的
On November 17, “Research and Application of BIM-based Super High-rise Steel Frame with Alien Bridge” - Construction Technology of Support Structure Based on BIM was appraised by Hubei Provincial Department of Housing and Urban-Rural Development and reached the leading level in China BIM-based visualization and structural simulation analysis of the combination of applications reached the international advanced level. The results through the BIM visualization will be the whole process of steel continuous construction bridge numerical simulation and stress analysis of different conditions to provide construction program optimization and control decisions, combined with field measurements, the formation of a “based on the ” Trinity Construction Process Control Of the special-shaped steel bridge construction technology to solve the construction of super-shaped steel bridge with the technical problems. At the same time, in theory analysis