POT Model of Operation Vehicle Load under Toll-by-weight Mode

来源 :2016年交通基础设施和材料国际会议 | 被引量 : 0次 | 上传用户:huanhuan40705
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  The phenomenon of overload operation of Expressway vehicles is particularly serious in China recently.Research on the extreme value of the vehicle load and its development trend is an urgent problem in the design of toll-by-weight mode.On the basis of statistical analysis of a highway WIM data under toll-by-weight mode in Guangdong Province,the vehicle load according to the models of the gross vehicle weight of the statistical analysis by the extreme value analysis theory to establish the pot model,gross vehicle weight distribution in the tail of the distribution function is obtained,and scientifically predict future arbitrary reproduce that may arise during the period of vehicle load value.Results show that the high speed sections of large tonnage vehicles is not accidental,in the future may also appear more large tonnage vehicle load and to pose a serious threat to the safe operation of the bridges and roads.Finally,based on the research results,the toll-by-weight standards proposed improvement suggestions and comments.It provided a useful reference for effectively control ling overloading vehicle loads.
其他文献
  To develop a low-carbon construction model for bituminous pavement construction,this study divides the fieldwork construction of bituminous pavement into ag
冻胀、积冰会给隧道造成巨大压力,改变隧道的应力环境,危及隧道的稳定性与安全性,是寒区隧道常见的冻害.为了防止冻胀、积冰冻害的发生,隧道施工时,须在初期支护与二期衬砌之
  In order to make thin layer paving one-step shaping during polymer concrete pavement construction,the relationship model between vibration parameters,struct
2012年哈大高速铁路发生冻胀现象后,一系列路基冻胀的监测研究工作被相继开展.本文在整理分析大量实测数据基础上,分别从宏观和微观方面出发,多角度地总结提炼了路基冻胀发生
本文依托寒区高速铁路——哈大客运专线运粮河特大桥工程实例,利用大型有限元软件Midas/civil建立数值仿真模型,详细模拟了桥梁各施工阶段,根据后期变形最大的原则确定箱梁徐
  Pavements are one of the major contributors to the urban heat island(UHI)effect of cities because they cover a considerably large fraction of urban ground s
会议
  Accurate assessment of effort,time and resources for estimation of project cost is a challenging task for project managers.Several methodologies are commonl
会议
  Earthquake action in the design of the bridge belongs to the accidental action.Earthquake is difficult to predict,so the frequency of its occurrence is very
  Piled embankments have been widely used in road engineering.A unique mechanical behavior which is called soil arching effect in piled embankments is a key f
会议
  The safety issues of high speed railway have always been widely concerned by people.With the rapid development of high speed railway technologies,China has