  To explore the feasibility of weathered shale as expressway subgrade,the study on the mechanism of shale weathering and its filling strength(CBR test)were carried out.The SEM images of shale samples from Zhang Cheng expressway under different immersion time were obtained and the mineral components and micro-structure were observed and analyzed.The chemical and mineral compositions as well as clay mineral of shale samples were also tested by X-ray diffraction method.Time scope for disintegration,weathering mechanism and micro-structure change of shale samples were discussed.Based on these experiments,California bearing ratio(CBR)tests under different compaction degree were carried out under the optimum water content of shale samples within the range of ±0.8%.The test results show that the most disintegration of shale occurred within 12 hours and the complete disintegration was within 24 hours and micro-structure,mineral and chemical compositions changed dramatically; The CBR value of shale sample after disintegration can satisfy the requirements of subgrade filling on expressway construction.
其他文献
  Accurate assessment of effort,time and resources for estimation of project cost is a challenging task for project managers.Several methodologies are commonl
会议
  Earthquake action in the design of the bridge belongs to the accidental action.Earthquake is difficult to predict,so the frequency of its occurrence is very
  Piled embankments have been widely used in road engineering.A unique mechanical behavior which is called soil arching effect in piled embankments is a key f
会议
  The safety issues of high speed railway have always been widely concerned by people.With the rapid development of high speed railway technologies,China has
  The phenomenon of overload operation of Expressway vehicles is particularly serious in China recently.Research on the extreme value of the vehicle load and
  Since low temperature environment is one of the major problems encountered in the construction of asphalt pavement in northern XinJiang,this paper analyzes
会议
  In this paper a method is set up for assessing the best strategy for the management of a railway infrastructure over time.A model to evaluate the total cost
会议
  A series of consolidated-undrained tests was carried out on compacted loess with a hollow cylinder torsional shear apparatus to investigate the stress-strai
  Weathered granite soil is abundant in China and it is used extensively as a fill material.However,systematic research on this material is relatively less as
  Funding the maintenance,rehabilitation and reconstruction(MR&R)of highway infrastructure is becoming a challenging task for highway agencies around the glob