Risk analysis of gravity dam instability using credibility theory Monte Carlo simulation model

来源 :2016年全国大坝安全监测技术与应用学术交流会 | 被引量 : 0次 | 上传用户:ooo2231
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Many designed and measured values in anti-sliding stability of gravity dam are uncertain.Most of existing fuzzy-random risk analysis methods are based on the possibility theory and describe structural failure risk ratio by combining possibility measure and probability measure.Risk ratio described by these methods has a probability interval of fuzzy confidence level and will result in fuzzy evaluation.To overcome this shortage,credibility theory was used to map the membership function of fuzzy variables from possibility measure into probability measure.Characteristics of randomness and fuzziness can be processed in the same frame.The credibility theory-Monte Carlo simulation model was explored and applied to calculate failure risk ratio of gravity dam.Results showed that the proposed method could express probability risk ratio involving system randomness and fuzziness in determined values, which is conducive to risk evaluation and index determination.This method possessespromising application prospects.
其他文献
支持向量机的核函数选择对大坝监控模型的预测精度具有较大影响,基于支持向量机结构风险最小化理论以及小波框架理论,提出用小波核函数代替高斯径向基核函数(RBF)的方法,并采用粒子群算法对支持向量机的参数进行寻优,得到一种新的大坝变形预测模型.通过实例,将结果与采用RBF核函数的支持向量机模型以及统计回归模型做对比,结果显示采用小波核函数的支持向量机精度更高,泛化能力更强.
大坝变形监测设施所获得监测数据序列受噪声污染并呈强非线性以及混沌特性.为对其进行预测分析,需对监测数据进行去噪去理,并选用泛化能力强、非线性预测效果好的模型.基于此,提出一种基于相空间重构的小波支持向量机(简称W-PSVM)模型.该模型利用小波分析的时频分析、多分辨率分析等优点,先对序列进行时频分解,将非平稳的变形序列变为多个不同分辨率下的平稳子序列,并对各高频子序列进行阈值去噪处理;根据混沌相空
大坝工作性态影响因素众多、属性的特征多样、相互关系复杂,对其安全状况的综合评估是一个典型的不确定性问题.充分考虑大坝安全评估过程中的模糊性和随机性,组合应用云模型和D-S证据理论开展了大坝安全多指标综合评估方法研究.依据大坝安全评估多指标体系和安全等级划分标准,借助云模型实现D-S证据理论中基本概率赋值的确定,进而基于D-S证据理论并加以改进,构建了大坝安全综合评估模型,提出了相应的综合评估实现方
土石坝坝体渗流对上游水位等环境量具有滞后效应,在确定坝体浸润线和建立渗流监测数学模型时必须充分考虑这种滞后效应的影响,目前主要通过定性分析来估算滞后时间.基于信息学原理,将上游水位视作信息源,将坝体渗压测点视作信息作用点,利用信息熵理论中互信息有向信息传递指数DITI概念,构造土石坝上游水位与坝体渗压水位之间的信息传递模型,采用最大信息传递量作为判定准则,确定坝体渗压水位对上游水位的滞后时间.工程
As the number of aging dams is increasing, an efficient and feasible probabilistic method is required to analyze the uncertainties of a dam system with multiple failure modes.Due to the limitation of
会议
Mechanical properties of aging dams and rock foundations can differ significantly from those design values used during construction.It is necessary to conduct the inverse analysis of mechanical parame
高速铁路对路基、桥涵、隧道等线下工程的工后沉降要求十分严格,而现有的沉降设计计算受到多种因素的影响,计算精度不足以控制无砟轨道工后沉降.因此,工后沉降的控制应以施工期间系统的沉降观测与综合分析评估为主.通过对沉降观测数据系统的综合分析评估、验证或调整设计措施,使路基,桥涵、隧道工程达到规定的变形控制要求,分析推算出最终沉降量和工后沉降,对合理的确定无砟轨道开始铺设时间,确保高速铁路无砟轨道结构铺设
垂线监测作为大坝变形监测的主要手段,一直是大坝安全资料分析、评价的关键项目.本文简要介绍了山口岩大坝垂线监测布置情况,分析了近4年的垂线实测资料,初步讨论坝体水平位移变化的规律.通过监测成果分析表明,大坝垂线系统布置合理,监测仪器工作性态正常,监测数据所反映的大坝位移变化趋势与水位相关性较好,垂线监测系统为大坝安全稳定运行提供了良好的保障.
An inverse modeling process is proposed to estimate the actual elasticity modulus of a high arch dam based on unconstrained Lagrange support vector regression (ULSVR) and monitoring data.The proposed