意大利南方的塔兰托城建成了一个新的钢铁厂。该厂反映了现代炼铁和炼钢机组大型化的发展趋势。该厂有两座大型高炉,每座设计能力是3600吨昼/夜。两座300吨的氧气转炉。高炉用皮带运输机上料,上料系统由17个运输带组成,最长的275米。运输带上装有称量器,误差士1%,并用电视机观察原料在运输带上的运送情况。料仓上有计算机,用开闭器或穿孔卡片来操纵。高炉上料可用计算机来调节。同时用计算机还可算出高炉小钟上各种炉料的数量。
Taranto City in southern Italy built a new steel plant. The plant reflects the trend of large-scale modern iron-making and steelmaking units. The plant has two large blast furnaces, each designed capacity of 3600 tons day / night. Two 300-ton oxygen converter. Blast furnace belt conveyor feeding, feeding system consists of 17 conveyor belts, the longest 275 meters. The conveyor belt is equipped with a weighing device, 1% error, and the use of television to observe the transport of raw materials in the transport belt. Silo has a computer, with a shutter or punch card to manipulate. Blast furnace feeding can be adjusted by computer. At the same time using the computer can also calculate the number of blast furnace small bell on a variety of charge.