论文部分内容阅读
我们多年强调的工程总承包迟迟形不成气候,现在有的甲方对工程的干预比以前更严重,设计要干预,材料要干预,分包单位要他来找,据说还形成了很多潜规则。建筑业现在面临着状况令人担忧,从建筑企业面临问题的表现来说,有“三低三高”:劳动生产率低、产值利润率低、对全国GDP的贡献率低,建造过程能耗、物耗、碳排放水平高。举一个例子:以增加值计算的劳动生产率,2008年德国是人均115.62万元,我国是3.24万元。单从数字来看,德国是我国的35.7倍。和提供数据的同志讨论,我认为这个数据可能还得根据货币的购买力水平调整一下,但是怎么调整恐怕也得
We have been stressed for many years the project general contracting delays in climate, and now some of the Party A intervention in the project more serious than before, the design intervention, materials to intervene, the subcontractor asked him to come, it is said that also formed a lot of unspoken rules . The construction industry is now facing a worrying situation. In terms of the problems faced by construction enterprises, the “three lows and three highs”: low labor productivity, low profitability of output value, low contribution rate to the national GDP, Consumption, material consumption, high level of carbon emissions. To give an example: to calculate labor productivity, in 2008, Germany was 1.1562 million yuan per capita, China is 3.24 million. From a single point of view, Germany is 35.7 times our own country. Discuss with the comrades who provide the data, I think this data may have to be adjusted according to the purchasing power of currency, but how to adjust may also have to