论文部分内容阅读
进出水口作为呼蓄上水库工程主要结构,是蓄电、发电过流和库盆防渗的关键部位,工程技术和工程质量要求高。为确保工程进度和质量,在模板安拆、钢筋连接、止水安装、混凝土布料平仓等关键工序研究快速施工工艺。
As the main structure of Hu-reservoirs project, the inlet and outlet are the key parts of power storage, over-current generation and seepage prevention of reservoir basin. The requirements of engineering technology and engineering quality are high. In order to ensure the progress and quality of the project, the rapid construction process is studied in the key processes such as template installation, steel connection, water stop installation and concrete material closures.