论文部分内容阅读
为了解决采掘接替紧张,确保安全生产,针对千秋煤矿煤层具有冲击地压严重性,施工中采取科学合理的方法和行之有效的综合防治冲击地压和瓦斯措施,最终实现快速掘进和安全生产。
In order to solve the problem of extractive succession and ensure safe production, aiming at the severity of rock burst in the coal seam of Qian Qiu Coal Mine, a scientific and reasonable method and a comprehensive effective prevention and control of rock burst and gas measures during construction are adopted to achieve rapid excavation and safety production finally.