Risk identification and risk mitigation during metro station construction by enlarging shield tunnel

来源 :Journal of Southeast University(English Edition) | 被引量 : 0次 | 上传用户:pangpang925
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method. Constructing a metro station by enlarging shield tunnels combined with a mining / cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing u pper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method.
其他文献
瑞士Contubind S.A.公司的A.H.Calmes于1957年发明了对多边形坯料压力穿孔的新方法,并手1958年开始最初试验以来进行了一系列试验,直到1968年来又进行了较大规模的工业试验
作为昔日“日不落帝国”的中心,伦敦荟集了全球的历史、科技与文化元素。在西敏寺大教堂品味大本钟承载的厚重历史,在泰晤士河畔感受伦敦眼散发的现代科技之光,在国家艺廊领
高温合金GH135是近几年来我国冶金部门立足国内资源独立创制的新型铁基高温耐热合金,具有很好的机械性能。但是,这种铁基合金由于可加工性差,所以给金属切削加工带来了一定
在最近召开的温州市人大会议上,市人大代表就如何搞活大中型国营企业,提高经济效益,扭转亏损局面问题,提出五点建议: (一)政府要增强为企业服务的观念,下功夫切实制止“三乱
Two exceptionally well preserved skulls of Machairodus foundin the Lower Pleistocene of Choukoutien are described herein.They belong to twodifferent sections o
在火成岩、变质岩、混合岩中,“球状”岩石是不乏见的。“球状”岩石最早为伯奇(Buch)所描述,以后一直为岩石学家所注意。对“球状”岩石中球体的成因,有各种各样的解释莱维
1、概况在无产阶级文化大革命中,我厂广大革命职工在伟大领袖毛主席“备战、备荒、为人民”伟大战略思想指引下,自力更生,夫自己发展工业的道路,在党的领导下,组成了以工人
截至 2 0 0 1年 1 2月 ,澳大利亚人工林总面积为1 5 6.89万 hm2 ,其中 62 %是针叶林 ( 97. 96万hm2 ) ,37%为硬阔林 ( 5 8.79万 hm2 )。硬阔人工林继续保持增长趋势 ,1 994年
为贯彻党中央、国务院关于报刊治理整顿工作的部署,适应社会主义市场经济发展的客观要求,更好地服务于广大读者,我社决定:自2004年起,《财务与会计》月刊改自办征订发行为邮
在生产ZQ型减速机时,由于其轴承盖之固定槽难于加工(图1),因此,我们设计了一种专用切槽刀(图2)。实践证明,这种刀具效果良好。这种工具可装在立铣上,也可改换刀杆装在钻床上