论文部分内容阅读
为了保证工程质量、降低工程造价、加快施工进度,以提高经济效益,我部有关领导根据1982年4月在京召开的基建工作座谈会精神,责成基建局有关人员对黄埔新港集装箱码头七泊位堆场铺面小方块,以及湛江港一区南突堤码头委托外单位预制的桩和梁板的施工质量进行检查,并指示我编辑部派员实地了解情况、及时组织报道。下面发表有关这次质量检查的技术部分,以供航务工程系统有关领导同志和科技人员参考。
In order to ensure the quality of the project, reduce the construction cost and speed up the construction schedule so as to enhance the economic efficiency, the relevant leaders of our department, in accordance with the spirit of the Symposium on Infrastructure Construction held in Beijing in April 1982, instructed the officials of the Bureau to instruct the officials of the infrastructure bureau of the berth of Huangpu New Port Container Terminal Paved squares and the construction quality of piles and beams prefabricated by external units commissioned by South Jetty Terminal in Zhanjiang Port Area 1 and instructed my editorial department to send members to understand the situation on site and organize timely reports. The technical part of the quality inspection below is published for reference by the relevant leaders and scientific and technical personnel of the flight engineering system.