Time derivative of earthquake acceleration

来源 :地震工程与工程振动(英文版) | 被引量 : 0次 | 上传用户:liaoquanya
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Unlike acceleration, velocity, and displacement, the time derivative of acceleration (TDoA) of ground motion has not been extensively studied. In this paper, the basic characteristics of TDoA are evaluated based on records from the 1999Chi-Chi, earthquake (Mw 7.6) and one of its aftershocks (Mw 6.2). It is found that the maximum TDoA at a free-field station was over 31,200 crm/s3 (31.8 g/s); and the duration of "strong" TDoA, between the first and the last time points exceeding 2,000 cm/s3 (2 g/s), was almost one minute near the epicenter area. Since ground TDoA sensors are not commonly available,the time series are calculated by direct numerical differentiation of acceleration time series. Relative error analysis shows that the error is non-transitive and total error is within 4%. The density function of TDoA amplitude, frequency content and spatial distribution of peak ground jerk (PGJ) are evaluated. The study also includes examination of some TDoA responses from a seven-story building and comparison of ground TDoA with the limit TDoA used in the transportation industry for ride comfort. Some potential impacts of TDoA on humans have also been reviewed.
其他文献
The Tsagaanbulag Formation of the Ulaan-Shand section in the Shine Jinst area was assigned to Silurian (Wenlock-Pridoli) previously. But the present authors hav
A brand new direct and adaptive slicing approach is proposed, which can apparently improve the part accuracy and reduce the building time. At least two stages a
根据与相关规范,采用运行速度作为评价指标,对广州市北二环高速公路萝岗联络线出入口工程方案设计进行了速度协调性评价,并结合互通立交最小安全间距分析,对该方案设计的安全
The paper presents the algorithms for retrieving atmospheric temperature and moisture profiles and surface skin temperature from the high-spectral-resolution At
对中小跨径桥梁单板受力成因进行简单分析并提出相应的防治措施,可为在实际中处理好中小跨径桥梁单板受力问题奠定理论基础.
Using Isothermal Adsorption/Desorption System Model IS-100 and Electrohydraulic Servo Rock System Model MTS815 as the main apparatuses and collecting samples fr
A viable option for increasing nitrogen (N) use efficiency and mitigation of negative impacts of N on the environment is to capitalize on multi-element interact
随着我国公路建设的飞速发展,时高等级公路建设中广泛使用的沥青混凝土路面质量的要求也越来越高.本文作者结合工程实例,计时一级公路沥青路面工程施工的质量控制,激光纹理评
The long-term adjustment processes of atmosphere and ocean in response to gradually increased atmospheric CO2 concentration havebeen analyzed in 70 and 140 a in
Numerical simulation of fluid migration during the ore-forming process of the Carboniferous exhalationsedimentary (Sedex) massive sulfide deposits in the Tongli