论文部分内容阅读
经济的发展,推动了隧道工程施工系统的更新,在此过程中,隧道工程施工测量放样技术不断得到更新。在实际施工作业过程中,测量工作受到诸多因素的影响,比如洞内环节、测量放样技术水平的影响,并且其开挖面的测量放样水平与测量过程中的安全工作是切身相关的,与整个工程的施工质量效率密切相关。为了保证隧道施工质量的提升,我们要进行隧道工程施工测量放样技术的更新,实现对超欠挖现象的有效控制,进行地面曲线计算方法的有效应用。
The economic development has promoted the renewal of the tunnel construction system. In this process, the technology of tunnel construction survey lofting has been continuously updated. In the process of actual construction work, the measurement work is affected by many factors, such as the inner link, the influence of the measurement lofting technology level, and the level of measurement lofting on the excavation face is closely related to the safety work in the measurement process. The construction quality and efficiency of the project are closely related. In order to improve the quality of tunnel construction, we need to update the technology of stakeout measurement in tunnel construction, realize the effective control over the overbreak and underbreak phenomenon, and make effective application of the ground curve calculation method.