论文部分内容阅读
随着国际招标工程的增多,我国现行的概(估)算规定及编制方法已不能适应形势发展的需要,与国际接轨已势在必行。直接费计算国内采用单价法.而国际上通用实物法,两者有着很大的差异,分析其特点:(1)单价法由于国家颁发的规程规范具有法令的性质,执行时不得有随意性、任意性。也就是说国家采取特定的方法和形式根据工程建设定额来确定建筑产品的价格。目前,在新的编制规程
With the increase of international tendering projects, the current provisions (estimates) and the methods of preparation in our country can no longer meet the needs of the development of the situation. It is imperative to keep pace with the international standards. The direct cost calculation adopts the unit price method in China, while the international common physical method has a great difference between them and its characteristics are analyzed: (1) Since the unit price method possesses the nature of the decree, the regulations of the unit price shall not be arbitrarily enforced, Arbitrary. In other words, the state adopts a specific method and form to determine the price of construction products based on the quota of construction projects. At present, the new rules of preparation