论文部分内容阅读
坝体填筑质量差,坝坡凹陷、局部塌陷。坝顶无防浪墙。迎水面护坡无垫层,护坡石粒径小,散乱,风化,缺失,坡面淘刷严重;背水坡坡脚无排水体,大面积散浸,坝基渗漏量大。溢洪道宽度不一,岸坡及底板未护砌,边坡较陡,严重滑塌,出口跌差大,冲刷拉切严重。输水洞进口基础淘刷,洞身裂缝漏水,水库无启闭设施。无观测设施。
Dam body filling quality is poor, dam slope depression, partial collapse. No anti-wave crest wall. There is no cushion facing the water surface protection slope, and the size of the slope protection stone is small, scattered, weathered, missing, and the scouring on the slope is serious. There is no drainage body at the foot of the water slope, and the seepage is large in the dam foundation. Spillway width varies, the slope and the floor is not supported, the slope is steep, serious slump, export decline, serious erosion Rachel. Import base water scouring holes, cracks in the hole fissures, no opening and closing facilities reservoir. No observation facilities.