深圳发展中心大厦的超厚钢板焊接技术深圳发展中心大厦主楼由钢筋混凝土剪力墙和钢结构组成(该工程施工详见本刊1993,No.3)。钢结构部分占主楼平面3/4,是地上43层、高165.30m的钢架结构。该工程共安装了钢构件11049t,在安装施工中,采用了...
The super-thick steel plate welding technology of the Shenzhen Development Center Building The main building of the Shenzhen Development Center Building consists of a reinforced concrete shear wall and a steel structure (for details of the construction of this project, see 1993, No. 3 of this publication). The steel structure, which occupies 3/4 of the main building, is a steel structure with 43 floors above the ground and 165.30m in height. A total of 11049t steel components were installed in the project. During installation and construction, ...