LT电梯运行超越研究及工程实现

来源 :控制工程 | 被引量 : 0次 | 上传用户:lee419444083
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
分析环型电梯整体系统中后行轿厢超越控制的技术条件、相关参数及工程实现方法。分析和证明了在大楼各层相同条件下,后行轿厢超越先行轿厢的概率和超越次数;并证明:当电梯服务层数不变,轿厢的乘客人数越多时,则发生超越的次数最大值越小;当轿厢的乘客人数不变,则楼层数越多时,轿厢发生超越的次数最大值亦越大;用数学分析方法提出和证明了在大楼各层不同的条件下,后行轿厢超越先行轿厢的概率和超越次数,并加量化表示。这对进一步提高电梯运行超越工程实现技术有指导意义。 The technical conditions, relevant parameters and project realization methods of the backward car beyond control in the overall system of ring elevator are analyzed. The probability and the number of overtaking beyond the first one are analyzed and proved under the same conditions on all floors of the building. It is also proved that the number of overrun occurs when the number of passenger cars in the elevator is the same The maximum value is smaller; when the number of passengers in the car remains the same, the maximum number of times the car exceeds the maximum when the number of floors is greater; the mathematical analysis method is used to present and prove that under the different conditions of the floors of the building, The probability of the line car exceeding the preceding line and the number of times of overrun are added to the number of lines. This is to further improve the operation of the elevator beyond the project to achieve technology has guiding significance.
其他文献
与普通建筑相比,绿色节能建筑的优势主要表现为其对环境产生的污染较小.在绿色节能建筑施工过程中,常用的施工技术主要包含保温节能施工技术、地源热泵节能技术以及环境保护
建筑工程确定工程造价的关键环节就是建筑的预结算审核,预结算审核的内容和方法直接关系着工程造价管理的质量和效率,因此本文分析了建筑工程预结算审核工作的重点内容.
随着市场经济和科学技术的进步,近年来我国的桥梁施工技术得到了快速发展,后张法预应力箱梁施工技术作为桥梁预应力构件制作的成熟工艺,它能够充分利用材料的强度性能,以提高
土方地形工程施工的质量是切实保证园林绿化效果的重要基础,在保证地形检测准确型的基础上,一定要采取科学的土方工程施工技术,从而切实保障土方地形工程施工的质量,文章对园
市政路桥工程能够反映出一座城市的文化、经济水平,是城市发展的重要标志.混凝土作为基础建筑材料,在各类工程建设中应用广泛.随着城市化发展进程加快,路桥工程建设不断增加,
随着新课程改革的深入推进,中小学数学衔接已成为许多数学老师重点关注的课题。作为一名数学教师,要根据学生的身体和心理特征,帮助学生实现从小学到初中的跨越。 With the
文章利用StrandSpace模型对ISI支付协议进行了分析,得出了与卿_周逻辑分析方法相同的结论,并将StrandSpace模型对认证协议协定性的分析方法应用到了电子商务协议公平性的分析。