大采高综放开采截割高度的确定

来源 :煤炭技术 | 被引量 : 0次 | 上传用户:forgauss
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
大采高工作面截割高度的确定受很多因素的影响,以塔山矿101工作面开采条件为背景,采用FLAC3D数值模拟及工程实测研究手段,研究了不同截割高度下煤壁片帮、支架工作阻力以及顶煤运移规律和回收率。研究结果表明:支架工作阻力、煤壁破坏程度、顶煤冒放性和截割高度呈非线性的正相关,顶煤回收率则随截割高度的增大先增加后减小;综合煤壁稳定性、支架选型、顶煤冒放性及采出率确定101工作面截割高度为5 m是合理的。 The determination of the cutting height of the big mining face is affected by many factors. Taking the mining conditions of Tashan 101 face as the background, the numerical simulation of FLAC3D and the engineering measurement research are used to study the influence of the coal wall slice support, Work resistance and top coal migration and recovery rate. The results show that there is a non-linear positive correlation between working resistance of support, degree of damage of coal wall, top coal discharge and height of cut. The top coal recovery increases first and then decreases with the increase of cutting height. Stability, scaffold selection, top coal caving and recovery rate of 101 face cut-off height of 5 m is reasonable.
其他文献
1病例资料患者,女,68岁。主因“躯干四肢红斑、丘疹、鳞屑伴痒3个月,弥散周身1个月”收入首都医科大学附属北京友谊医院。3个月前因甲状腺良性肿物于外院做甲状腺部分切除术,
质权的本质在于支配质权标的的交换价值,以股权设立质权最关键的是限制股权转让 The essence of the pledge is to control the exchange value of the pledge. The most cr
焦作现象其本质意义在于发挥政府主导作用,赤峰市旅游资源丰富,尤其是人文旅游资源特色显著,应注重发挥好政府的主导作用,规划好以红山文化为代表的赤峰人文旅游资源,打造赤峰旅游
目的观察早期干预对脑性瘫痪(脑瘫)患儿进食困难的治疗效果。方法温州市第二人民医院于2002-03—2004-10,对收治的34例脑瘫患儿(观察组)进行摄食及口咽运动康复训练6个月至1
目的:提高新生儿窒息的抢救成功率,同时尽可能避免和减少并发症的发生。方法:严格按新生儿窒息ABCDE复苏方案复苏,并着重加强复苏后护理。结果:本院新生儿窒息抢救成活率有了显著
介绍了有源相控阵雷达天线的热设计方案,给出了等量送风在结构上的实现方法、公式推导和计算方法,并且通过小面阵模拟试验证明该方法有效.
本文论述了低温余热发电技术的应用与发展战略,为低温余热发电技术走可持续发展的道路提供了一定的见解。
运行于中压电力系统的电抗器中,干式空心结构的应用比例最大。目前或因电抗器重要性不比主变等设备,对电抗器的事故分析和保护研究并不多。现有保护装置并不能及时准确地针对
香菇是日本主要的特用林产品,香菇产业为日本农业经济的发展,特别是山区经济的发展起到了十分重要的作用.近10多年以来,由于日本人口老龄化所导致的劳力不足,以及日元汇率的
水资源是基础的自然资源和战略资源,同时也是生态环境的控制性要素。但是目前,很多地区存在着水资源利用不合理现象,严重阻碍了区域可持续发展的进程。基于此,对甘肃省天水市