论文部分内容阅读
随着我国现代化建设的不断发展,土地资源与工程项目之间的矛盾越来越突出,为了提高城市土地的使用效率,高层建筑的开工量越来越多,筏板基础大体积混凝土的应用也越来越广泛。相比于常规混凝土结构来说,筏板基础大体积混凝土在制作过程中所产生大量的水化热,需要科学合理地筏板基础大体积混凝土进行配制,避免出现严重的裂缝问题。
With the continuous development of China’s modernization, the contradiction between land resources and construction projects has become more and more prominent. In order to improve the utilization efficiency of urban land, more and more high-rise buildings are being started, and the application of mass concrete with raft foundation More and more widely. Compared with the conventional concrete structure, the huge mass of hydration heat generated by mass concrete in raft foundation is required to be scientifically and rationally prepared by mass concrete with raft foundation to avoid serious crack problems.