江苏省建工系统全民和县以上集体建筑企业生产完成情况比1989年初的预料要好: 1.施工面积为1232.12万平方米,比1988年仅减少2.8%。这是由于1988年跨至1989年的施工面积高达729.3万平方米,比1987年接转1988年的工程增加9%的缘故。所以尽管1989年新开工面积大量减少,总的施工面积仍未受到严重影响。随着基建投资的进一步压缩,1990年新开工工程还将进一步减少,加上1989年跨到1990年的未完工程比上一年少8%,预计1990年的施工任务更
The completion of production of collective construction enterprises in the construction industry in Jiangsu Province and above the county level was better than expected at the beginning of 1989: 1. The construction area was 12,32,200 square meters, a decrease of only 2.8% from 1988. This is due to the fact that the construction area spanning from 1989 to 1989 was as high as 7.293 million square meters, which was 9% higher than the 1987 project that was transferred to 1988. Therefore, although the area of newly started construction in 1989 has been greatly reduced, the total construction area has not been seriously affected. With the further compression of infrastructure investment, new construction projects will be further reduced in 1990, plus 8% of the unfinished projects that crossed into 1990 in 1989, and it is expected that the construction tasks in 1990 will be even greater.