论文部分内容阅读
河南宝泉抽水蓄能电站装机4 ×300 M W, 年发电量2010 亿k W·h , 年抽水耗电量2642 亿k W·h , 综合效率076 。在设计中遇到了几个重大技术问题并采取了相应措施, 主要有: 上库渗漏量较大, 库底防渗采用局部开挖覆盖层、回填石渣粘土铺盖防渗, 库岸用沥青混凝土防渗; 下库原有浆砌石重力坝加高加固, 采用钢筋混凝土面板防渗, 解决了水下施工问题; 输水洞开挖后因各段岩性不同, 采用了多种衬砌形式; 机组额定转速选用4286r/ min 。
Henan Baoquan Pumped Storage Power Station has installed capacity of 4 × 300MW and annual generating capacity of 2.01 billion kw · h, annual power consumption of 2642 million kw · h, and comprehensive efficiency of 0.76. In the design, we encountered several major technical problems and took some corresponding measures. The main problems are as follows: a large amount of seepage in the upper reservoir, partial excavation coverage in seepage prevention at the bottom of the reservoir, impervious seepage with gravel clay backfilling, Concrete seepage control; the original reservoir under the original masonry gravity dam heightening reinforcement, the use of reinforced concrete panel seepage, to solve the problem of underwater construction; water diversion tunnel excavation due to different lithology, using a variety of lining forms; Unit rated speed selection 428 6r / min.