论文部分内容阅读
建设加油站的全过程中,大部分都存在着工程建设超出预算成本、结算超出预算等情况,为了更好的将加油站工程建设造价成本控制需要充分将其造价成本、建设周期等有关因素进行考虑,利用加油站建设工程工序的优化,实现最佳的资金投入产出比。根据这些,文中首先分析了全过程加油站工程造价控制的目的和必要性,同时分析了加油站建设全过程的工程造价方式,更好的达到控制加油站造价的目标。
In the whole process of building gas stations, most of the projects are in excess of the budgeted cost of construction and the settlement is beyond the budget. In order to better control the cost of gas station construction cost, we need to make full consideration of the cost, construction period and other related factors Consideration, the use of gas station construction process optimization, to achieve the best capital input-output ratio. Based on these, the paper first analyzes the purpose and necessity of project cost control in the whole process of gas station construction, and analyzes the project cost method in the whole process of gas station construction and better achieves the goal of controlling the cost of gas station.