论文部分内容阅读
根据梯级水电站联合调度节水增发电考核的必然性,建立起对应的考核模型和评价标准,基于考核水位对考核结果的影响,引进了考核水位自动判别机制,改进了季及季以上调节电站的考核电量算法,介绍了其具体的实现过程。以乌江洪家渡—乌江渡梯级水电站群为对象,开发了相应的考核软件。算例结果与生产实际情况一致,对广泛开展梯级水电站联合调度节水增发电考核具有借鉴意义。
According to the inevitability of cascade hydropower station dispatching water-saving electricity generation test, corresponding assessment models and evaluation standards are established. Based on the impact of assessment water level on assessment results, an automatic water level discrimination mechanism is introduced to improve the assessment of quarterly and above seasoned power plants Power algorithm, introduced its specific implementation process. With Wujiang Hongjiadu - Wujiang River cascade hydropower station as the object, the corresponding assessment software has been developed. The result of the example is in accordance with the actual situation of production, which is of reference significance to carry out the joint assessment of water-saving and electricity generation in cascade hydropower stations.