某工程7座风机基础在浇筑过程中,施工缝处理不当,基础存在分层。通过钻芯、地质雷达探测等方法对混凝土密实度进行了检测;并考虑风机基础结构和荷载的特殊性,分析分层面对基础承载能力的影响;综合检测和分析结果评价了各基础的安全性;对于安全性不满足要求的基础,提出压力注浆和在分层面增设抗剪键的加固方案,取得良好加固效果,现基础已安全运行2年;此外,对风机基础分层问题的防治提出了可行建议。
In the process of pouring, the foundation of 7 fans of some project is improperly handled and the foundation is stratified. The density of concrete was tested by means of core drilling and geological radar detection. The foundation structure and the particularity of load were also considered to analyze the influence of delamination on the basic bearing capacity. The safety of each foundation was evaluated based on the results of comprehensive testing and analysis ; For the safety does not meet the requirements of the foundation, put forward the pressure grouting and anti-shear key additional reinforcement program at the level, and achieved good reinforcement effect, the foundation has been safe to operate for 2 years; In addition, the basic stratification of the fan control Put forward feasible suggestions.