古教堂搬家

来源 :建筑工人 | 被引量 : 0次 | 上传用户:huangcong8888
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在捷克境内,有一座仅存的古老的16世纪的天主教堂。它坐落在一个富有开采价值的煤层之上。为了采煤的需要,但又要保存这座古老的建筑艺术珍品,决定让这座教堂搬家。新址距原址841米,而且新址地面比原址低10米,地面倾角0°42′20″。教堂长60米,宽30米(图1、2),塔顶高33.90米,外墙厚90厘米,木屋架,瓦屋面,总重13 000吨。搬迁前对房屋进行了加固,墙下加了 T 形钢筋混凝土承托梁,外墙加壁柱扶持。整个房屋用11米高的钢格架笼子环抱加固,然后用千斤顶顶升起来,放 In the Czech Republic, there is a surviving old 16th-century Catholic church. It is located above a coal seam rich in mining value. For the needs of coal mining, but to preserve this ancient architectural art treasures, decided to let this church move. The new site is 841 meters away from the original site, and the new site is 10 meters lower than the original site with an inclination of 0 degrees 42’20 inches. The church is 60 meters long and 30 meters wide (Figure 1, 2). The height of the tower top is 33.90 meters and the outer wall is 90 centimeters thick. , Wooden trusses, tile roofs, total weight 13 000 tons.Before relocation, the houses were reinforced, T-shaped reinforced concrete supporting beams were added under the walls, the external walls added pilasters to support. The entire house used 11 meters high steel grids. The cage is surrounded by reinforcements, then lifted with a jack and put
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
这个问题看起来很普通,但是工长如果不动一番脑筋,不细致地做一些技术工作,要把标高控制准确,是一件很难的事。我根据多年的施工实践认为,要准确地控制标高,必须认真做好以
期刊
期刊
智能手机发展实现全球实时连接,移动终端智能化、娱乐性功能日渐侵蚀人们的日常生活。手机游戏成为全球用户手机使用的重要内容之一,都市青少年智能手机持有率持续上升,数字化娱
互联网正在深刻地改变着我们的世界。今天,社会各个领域的人们都能明显感受到网络的冲击和由此产生的改变。作为网络社会兴起最重要的结果和标志之一,草根力量的崛起得到了人们
学位
根据建设部《关于建立和完善劳务分包制度发展建筑劳务企业的意见》,从2005年7月1日起,用3年时间在全国基本建立规范的建筑劳务分包制度,农民工基本被劳务企业或其它企业直接
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
突发事件是最具新闻价值,最受群众关注的新闻资源。在新闻史上,由突发事件新闻报道所造就的媒体品牌屡见不鲜。海湾战争造就了CNN的新闻神话,使其由一家资历尚浅的电视台一跃成