南水北调中线工程方城段第六标全长为7.55km。沿渠线共布置各类建筑物10座,包括3座倒虹吸工程,5座公路桥,2座生产桥,合同投资3.49亿。该段工程开工晚,工期紧,地况复杂,困难重重。在河南省水利第一工程局党委的坚强领导下,南水北调中线工程方城段第六标项目部的建设者们,以百日劳动竞赛为契机,以争先创优树标杆为动力,集思广益,开拓创新,攻坚克难,取得了一项又一项喜人的成绩,受到国务院南水北调办鄂竞平主任的高度评价,方城段第六标被国调办树为“南水北调中
The sixth standard of Fangcheng section of South-to-North Water Diversion Project has a total length of 7.55km. A total of 10 buildings of various types were arranged along the canal line, including 3 inverted siphon projects, 5 road bridges and 2 production bridges with a contract investment of 349 million. The project started late, tight schedule, complex conditions, difficult. Under the strong leadership of the Party Committee of Henan Provincial First Water Conservancy Bureau, the builders of the Sixth Standardization Project of Fangcheng Section of the Middle Route of South-to-North Water Diversion Project took the 100-day labor competition as an opportunity to take the lead in creating excellent tree benchmark as a driving force, brainstorming and exploiting Innovation, overcome difficulties, has made another gratifying achievement, by the State Department of South-to-North Water Diversion E Jingping director spoke highly of the Fangcheng section of the sixth standard by the country to do the tree as ”