益阳电厂工程在不改变原有设备的情况下 ,对土建工程的地下沟道、凝结水泵基础、抗风柱与屋架的连接、电缆夹层结构、煤仓间的煤仓层和运行层的冲洗进行设计优化 ,取得了较理想的效果。
Yiyang Power Plant project without changing the original equipment, the civil engineering underground tunnels, condensate pump foundation, windbreak and the roof of the connection, the cable sandwich structure, the coal bunker between coal and operating layer of the rinse Design optimization, achieved a more satisfactory results.