鞍钢大孤山铁矿75米至117米站行程3公里多,是矿山排土主要干线,过去采用电话闭塞只能通过88对列车,加上不定向运输安全无法保证,效率很低。随着矿山向深凹伸展,剥离量不断增大,运输量也相应增加,最繁忙的区间每昼夜通过能力达120对以上。如何提高运输效率,确保行车安全是摆在矿山职工面前的重要任务。我段信号工人在交通部设计的基础上解放思想,大胆革新,突破金属矿山运输不能采用自动闭塞行车制度的旧框框,使75米至117米实现了自动闭塞,开始了定向运输,使通过能力提高到210对列车,同时还消除了正面撞车和放错线等事故。从1973年3月使用以来,设备使用正常,受到运转员和司机的欢迎。(一)自动闭塞动作原理
Anshan Iron and Dagushan 75 meters to 117 meters station trip more than 3 kilometers, is the main route of mine dumping, the past use of telephone blocking only through 88 pairs of trains, coupled with the non-directional transport security can not be guaranteed, the efficiency is very low. As the mines extend to the deep, the amount of stripping increases and the volume of traffic increases correspondingly. The busiest section passes 120 pairs of day and night. How to improve the transportation efficiency and ensure traffic safety are the important tasks before mine workers. On the basis of the design of the Ministry of Communications, I have liberated our minds and boldly innovated and broke through the old framework of auto-blocking traffic system that can not be adopted for metal mine transportation. As a result, automatic blockage of 75 meters to 117 meters was achieved and directional transportation was started. Up to 210 pairs of trains, while also eliminating the front crash and misplaced accidents. Since its use in March 1973, the equipment has been used normally and is welcomed by both operators and drivers. (A) automatic blocking action principle