论文部分内容阅读
为进一步规范建设项目环境影响评价文件审批,统一管理尺度,环保部组织编制了火电、水电、钢铁、铜铅锌冶炼、石化、制浆造纸、高速公路等7个行业建设项目环境影响评价文件审批原则(试行),并于2015年12月18日下发了“关于规范火电等七个行业建设项目环境影响评价文件审批的通知(以下简称《通知》)”。国家环境保护政策和环境管理要求如有调整,建设项目环境影响评价文件审批按新的规定执行。《通知》中环保部要求,地方各级环保部门应切实加强建设项目环境影响评价管理,严格落实国家相关环境保护政策、规划及规划环评的要求,优化项目选址选线,提出有效的环境保护措施和风险防范措施,强化总量控制、区域削减、以新带老等污染减排要求,有效预防环境污染和生态破坏,促进区域环境质量改善,推动绿色发展。
In order to further standardize the examination and approval and unified management of environmental impact assessment documents of construction projects, MEP has organized the examination and approval of environmental impact assessment documents for construction projects of 7 industries such as thermal power, hydropower, steel, copper, lead and zinc smelting, petrochemical, pulp and paper making, and expressway (Trial), and on December 18, 2015, the Circular on the Examination and Approval of Environmental Impact Assessment Documents for Construction Projects of Seven Industries such as Thermal Power (the “Notice”) was issued. If the state environmental protection policies and environmental management requirements are adjusted, approval of the environmental impact assessment documents of construction projects shall be implemented in accordance with the new regulations. The Ministry of Environmental Protection requires that the local environmental protection departments at all levels should conscientiously strengthen the environmental impact assessment of construction projects, strictly implement the relevant state environmental protection policies, plan and plan the EIA requirements, optimize the route selection and propose effective environmental protection Measures and risk prevention measures should be taken to strengthen overall control and regional reduction so as to effectively meet the emission reduction requirements of new areas such as old ones, effectively prevent environmental pollution and ecological damage, promote the improvement of regional environmental quality and promote green development.