论文部分内容阅读
一、梧桐山隧道问题的由来梧桐山隧道是位于深圳梧桐山下,连结盐田区和罗湖区的公路隧道。它原本是企业化运作的,即由企业投资建设的,通过对过往车辆进行收费来收回成本和获取投资回报。这种运作方式当时是经过深圳特区政府批准的,也符合相关的法律法规规定。在建设并投入使用
First, the origin of the Wutongshan tunnel problem Wutongshan tunnel is located in Shenzhen Wutongshan, Yantian and Luohu District, the road tunnel. It was originally an enterprise-run operation, which was invested by enterprises. It recovered the costs and obtained the return on investment by charging the passing vehicles. This mode of operation was approved by the Shenzhen Special Administrative Region Government at the time and also complies with the relevant laws and regulations. In construction and put into use