在工程施工中对于道路和桥梁的衔接部位的处理是很容易被施工人员忽视的,会使得道路和桥梁的连接处在横向设计高度上不一致,从而也就给施工带来相应的负担。为了满足实际的道路施工要求,施工人员需要对桥头两侧的路拱横坡进行细微局部处理,使得道路和桥梁在各个高点的高程都能够平滑顺接。本文章便是对该问题进行研究分析。
In engineering construction, the handling of the connecting parts of roads and bridges can easily be neglected by construction workers, which will make the connection between roads and bridges inconsistent in the horizontal design height, which in turn imposes a corresponding burden on the construction. In order to meet the actual requirements of road construction, construction workers need to subdivide the slope of the road arch on both sides of the bridge head to make the road and bridge smooth smoothly at the elevation of each high point. This article is the study of the issue.