井下变电所遥控监视与操作

来源 :化工矿山技术 | 被引量 : 0次 | 上传用户:Final_believe
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
开阳磷矿青莱冲矿区采矿方法试验中,进口设备的电源变压器及配电开关柜均设在+960米水平的变压器峒室,而+940至+970米水平已经采完,采掘工作已转到+930米水平以下。由于进口设备使用的拖 电缆经常漏电,使变压器峒室内线路绝缘电阻监测器动作,配电开关柜停电。操作人员从地面去960变电所要走1.5公里,从井下去则至少走500米,且要经过采空区,很不安全。 鉴于此,笔者设计了一个电路,实现变电所有线远距离监视与操作。 Kaiyang Phosphate Mine Qinglongchong mining area test method, the imported equipment, power transformers and distribution switchgear are located at +960 meters level transformers 峒 room, and +940 to +970 meters have been taken mining, mining work has been Go below +930 meters. Due to the frequent use of towed cables imported equipment imported leakage, so that the transformer 峒 indoor line insulation resistance monitor action, power distribution switchboard power failure. Operators go from the ground to the 960 Substation 1.5 km away from go down to go at least 500 meters, and to go through the goaf, it is not safe. In view of this, I designed a circuit to achieve long-distance substation monitoring and operation of all lines.
其他文献
11月18日,CCTV 黄金资源现场人声鼎沸,“179”号频频亮牌,成为当天招标现场的焦点,而“179”号的持有者正是浙江东风绍兴有限公司的著名黄酒品牌“会稽山”,“179”与“要吃
1997年夏秋两季隆林县先后几次出现重大灾害性天气过程,是灾害性天气出现最频繁、损失最重的一年.本文对这几次气象灾害及导致灾害的环流形势、影响系统作初步分析,得到灾害
为解决三相异步电动机启动电流大所造成的影响电机寿命、电网和机械冲击等问题.采用了MSP430F149单片机和可控硅功率器件为核心,运用交流调压原理,完成了三相异步电动机软启
本文介绍了3DSMAX中各种类型灯光的的特点及应用场合,灯光设置的原则和方法以及各主要参数的含义和设置方法.
在多媒体辅助教学的过程中还要遵循教学的基本原则,根据具体的教学内容来灵活确定课堂教学的设计形式,不断完善计算机辅助教学软件,充分利用各种媒体的有机组合来有效调动学
几乎每位父母都有“望子成龙”的心态,于是,孩子的学习成绩就成了他们最关注的问题。但是,有些孩子偏偏就不爱上学,甚至厌倦学习,这可急坏了家长。不久前, Almost every par
公交车站牌下,一对母子正在等车。一阵大风把妈妈的围巾撩了起来,妈妈想用手按住围巾,可是手里还提着皮包,非常不方便。看 Bus stop card, a mother and son are waiting fo
本文主要针对车用空调用电磁线圈赵体零件展开分析研究.在对冲压冷锻技术特点进行简单介绍的基础上,较为深入的分析了罩体类零部件冲压冷锻成型工艺及坯料计算方法,相关实验
本文简要叙述了玻璃幕墙工程施工质量控制的过程要点,并有针对性地提出了质量控制措施.
当今的孩子多生长在“温室”,受到众星捧月般的呵护;生活中家长唯恐孩子吃一点苦、受一点委屈.这些父母没意识到,挫折教育是孩子更为重要的需求之一.