沈阳一大连高速公路普兰店大桥是控制全路通车的重要桥梁,工期紧,技术要求高,施工难度大。交通部一航局以港口建设施工工艺优异、快捷、安全地按期完成了任务,创造了在海湾建造跨海大桥的施工新工艺,成功地进行了二米直径,1000~#以上硬质岩石的嵌岩桩施工,为今后类似工程施工取得了可兹参考的经验。本文着重介绍了大桥基础部分的施工。
Shenyang-Dalian Pulandian Expressway Bridge Bridge is an important bridge opened to traffic control, tight schedule, high technical requirements, construction is difficult. The first flight of the Ministry of Communications has completed the task on schedule with excellent, quick and safe construction technology of the port construction, created a new construction process for the construction of a sea-crossing bridge in the Gulf, and successfully conducted hard rock of two meters in diameter and over 1000 # Rock-socketed piles construction, for similar projects in the future has made reference to Ku can experience. This article focuses on the construction of the basic part of the bridge.