东庞煤矿是河北省冀中能源股份有限公司的主力生产矿井,主副井建于20世纪70年代,1983年投产,主井提升质量为16 t,井筒直径为6m,井口尺寸为3 000 mm×2 200 mm,副井提升质量为13.8 t,罐笼长4 600 mm、宽1 400 mm、高2 850mm。主采2号煤层,平均厚度为4.18 m,目前进入井田东北部开采,2612工作面出现最大厚度2.57 m的夹矸,采高达到6 m。为保证煤炭资源回收和提高效率,该矿引进了MG900/2210-GWD型交流电牵引采
Dong Pang Coal Mine is Hebei Jizhong Energy Co., Ltd.’s main production mine, the main and auxiliary wells were built in the 1970s, 1983 put into operation, the main shaft to enhance the quality of 16 t, the borehole diameter of 6m, wellhead size of 3 000 mm × 2 200 mm, the auxiliary shaft hoisting mass is 13.8 t, the cage length is 4 600 mm, the width is 1400 mm and the height is 2 850 mm. The main coal seam No. 2 with an average thickness of 4.18 m is currently mined in the northeastern part of the minefield. Its maximum thickness is 2.57 m at 2612, with a maximum of 6 m. In order to ensure the recovery of coal resources and improve efficiency, the mine introduced the MG900 / 2210-GWD-type AC traction mining