南京九华山铜矿所属安基山矿区已投产两年了。该矿是在“文革”期间根据提供的全部D(C_2)级矿量作依据,确定设计生产能力为300吨/日。矿山实际生产能力按82年出矿量计算为118吨/日(其中包括基建附产的部分矿量),矿山实际生产能力为设计的生产能力的39%。根据矿山投产后生产勘探结果看,矿帚变化很大,因此重新确定安基山铜矿的合理生产能力,是本文探讨的基本内容。
Anji Shan mining area owned by Nanjing Jiuhuashan Copper Mine has been in operation for two years. The mine was based on the total amount of D (C_2) grade ore provided during the “Cultural Revolution” and the designed production capacity was 300 tons / day. The actual production capacity of mines will be 118 tons / day (including part of the mines appealed by infrastructure) in 82 years’ output. The actual production capacity of mines is 39% of the designed production capacity. According to the prospecting results after the mine is put into production, the mine broom varies greatly. Therefore, it is the basic content of this paper to re-determine the reasonable production capacity of the Anji Mountain Copper Mine.