我公司第三井巷工程队承担的山西铝厂龙门山石灰石矿的千米斜井与该矿通风斜井施工,1984年底胜利贯通。贯通后的平面、高程精度均超过冶金部颁发的标准。千米斜井工程的井口位于陡坡上,最高处的海拔标高为928.61米,最低处为380.83米,斜井全长1003.718米。与斜井贯通的还有平巷158.69米,通风斜井195米,联合性开拓贯通。这种在地形条件复杂的长距离斜井贯通,在我公司的施工史上还是第一次。
The third mine shaft engineering team of our company undertook the construction of the 1000m inclined shaft of limestone mine of Longmen Mountain of Shanxi Aluminum Plant and the ventilation inclined shaft of Shanxi Mine and passed the victory by the end of 1984. Through the plane, elevation accuracy are more than the Ministry of Metallurgical issued the standard. The well head of the 1000m inclined shaft project is located on a steep slope. The elevation of the highest point is 928.61m, the lowest is 380.83m and the inclined shaft is 1003.718m. There are 158.69 meters along the inclined shaft and inclined shafts, ventilation inclined shaft 195 meters, joint development through. This kind of long-distance inclined shaft penetrating through complicated terrain conditions is the first time in the construction history of our company.