论文部分内容阅读
小浪底水利枢纽工程位于黄河干流中游末端最后个个峡谷的出口,控制流域面积69.4万平方公里,距上游三门峡大坝130公里,总库容126.5亿立方米,其中,防洪库容51亿立方米,防凌和兴利库容41亿立方米,调沙库容10亿立方米,淤沙库容72.5亿立方米,是以防洪、防凌、减淤为主,结合供水、灌溉、发电的综合利用工程。该工程于1994年开工建设,1997
Xiaolangdi Hydro Project is located at the exit of the last canyon at the end of the middle reaches of the Yellow River. The control basin covers an area of 694,000 square kilometers, 130 kilometers away from the upstream Sanmenxia Dam, with a total storage capacity of 12.65 billion cubic meters, of which flood control storage capacity is 5.1 billion cubic meters. With a capacity of 4.1 billion cubic meters and a storage capacity of 1 billion cubic meters of sediment and a storage capacity of 7.25 billion cubic meters of sediment, it is based on comprehensive utilization of water supply, irrigation and power generation. The project started construction in 1994, 1997