论文部分内容阅读
危地马拉Pueblo Viejo水电站(装机容量30万千瓦)的建筑物中包括一条长26公里、直径5.7米、设计流量75米~3/秒的压力引水隧洞。隧洞穿过断裂
The Pueblo Viejo hydroelectric project in Guatemala (300,000 kilowatts of installed capacity) includes a 26-km-long pressurized water diversion tunnel with a diameter of 5.7 meters and a design flow of 75 to 3 seconds per second. The tunnel passes through the fracture