论文部分内容阅读
三百门水闸是澄饶联围工程的主要排水闸,其前、后护坦的加固采用了水下不分散钢筋混凝土的施工方法,取得了良好的效果,扼要介绍其施工方法,旨在推广和应用。
The 300-gate sluice is the main drainage gate of the Chengrao Interlocking Project. The reinforcement of the front and rear retaining shelves uses the construction method of underwater undispersed reinforced concrete and has achieved good results. The construction methods are briefly introduced to promote And application.