The identification algorithm for commensurate order linear time-invariant fractional systems

来源 :Journal of Harbin Institute of Technology | 被引量 : 42次 | 上传用户:gchongyuan
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
An efficient identification algorithm is given for commensurate order linear time-invariant fractional systems. This algorithm can identify not only model coefficients of the system, but also its differential order at the same time. The basic idea is t
其他文献
Strong ground motion of an earthquake is simulated by using both staggered grid finite difference method (FDM) and stochastic method, respectively. The acceleration time histories obtained from the bo
期刊
期刊
期刊
Under harmonic wave excitation, the dynamic response of a bilinear SDOF system can be expressed by the Hilbert spectrum. The Hilbert spectrum can be formulated by (1) the inter-wave combination mechan
期刊
1937年8月1日4时35分,山东菏泽县(曹州)发生7级地震,震中位置:北纬35.4度,东经115.1度。极震区东到马岭岗,西至东明县王坝岗,南到通古集,北至耿海,烈度达Ⅸ度。同日18时41分该地区又发生一次6(3/4)级地震,震中位置:北纬35.3度,东经115.2度。极震区在吴油房、朱楼、大马庄、王堂一带,烈度为Ⅷ度。此次地震使菏泽、东明二县遭受严重破坏,周围14县也受到不同程度破坏。极震区内
期刊
针对自然纹理背景,提出一种基于多尺度小波特征融合的人造目标检测方法。在小波变换域,纹理背景和目标区域的多级小波系数具有不同的能量分布,能量特征可作为简单、有效的空间特征来检测目标。由于小波函数具有良好的局域性特点,不同尺度下用它检测出的边缘特征点移位不会超过1个像素。融合边缘特征和能量特征进行人造目标检测,可有效地保证目标边界的定位精度,达到较好的鲁棒性和准确性。实验结果证明,该方法对纹理背景下人
期刊
本文介绍近来由俄国、希腊、意大利、乌克兰以及格鲁吉亚执行的欧洲合作项目SUPRE(Study of the ULF electromagnetic Phenomena Related to Earthquakes与地震相关的超低频电磁现象研究)的研究成果,讨论地震孕育区的地震-电磁监测方法的进展和地震灾害评估。主要内容是:在特定地震活动区正在使用的观测技术、提取地震前兆信号的数据处理方法以及地震孕
期刊
Mutual information (MI) based image registration has been found to be quite effective in many medicalimage applications. However, standard MI hampers the convergence of registration transformation pa-
期刊
A novel two-dimensional (2D) pattern used in camera calibration is presented. With one feature circlelocated at the center, an array of circles is photo-etched on this pattern. An ellipse recognition
期刊
. In this paper,a two-stage semi-hybrid flowshop problem which appears in graphics processing is studied.For this problem,there are two machines M_1 and M_2,and a set of independent jobs J={J_1,J_2,..
期刊