论文部分内容阅读
To improve the performance of an automated material handling system (AMHS) in 300 mm semiconductor fabrication plants (FABs), an overhead-hoist-transport (OHT) vehicle dispatching problem was described for semiconductor FABs. An original wafer lot dispatc