CCS水电站位于南美洲厄瓜多尔国,总装机容量1500 MW,为EPC总承包项目。CCS水电站首部枢纽设计根据水文泥沙条件、地形地质特点,电站运行要求并结合施工导流布置提出了技术可行,经济合理的首部枢纽布置方案;根据不同建筑物地基的特性及运行要求提出安全可靠、经济可行的基础处理方案,从监测结果来看,地基基础处理达到较好的效果,有效解决了地基基础的沉降变形问题,实际沉降量远小于规范允许最大沉降量,均满足工程运行要求。文章结合引水式电站首部枢纽布置所涉及的工程要素及特点,介绍了CCS水电站首部枢纽设计特点,为在建及待建类似工程设计提供参考。
The CCS hydropower station is located in the Ecuadorian country of South America with a total installed capacity of 1,500 MW and is EPC general contracting project. According to hydrological and sediment conditions, topographic and geological features, power plant operation requirements and construction diversion layout, the first hub design of CCS proposed a feasible and economically feasible first hub layout plan. Based on the characteristics of different buildings and the operation requirements, the paper proposes a safe and reliable From the monitoring results, the foundation foundation treatment achieves better effect and effectively solves the settlement deformation problem of foundation foundation. The actual settlement amount is much smaller than the allowable maximum settlement amount, all of which meet the engineering operation requirements. Combined with the project elements and features involved in the layout of the first hub of a diversion station, this paper introduces the design features of the first hub of the CCS hydropower station and provides references for similar projects under construction and to be built.