论文部分内容阅读
1998年4月26日至28日,国家电力公司工程建设局、中电联企业部在江苏省无锡市联合召开了“火电厂锅炉炉墙与保温经验交流会”。会议讨论了《火电厂热力系统保温油漆施工企业资质标准》和《关于提高电力建设保温工程质量的规定》2个文件的征求意见稿,同时进行了技术交流。会议收到了交流论文27篇,内容丰富,水平较高。本刊拟将会议评选出的优秀论文中的9篇组成专栏,奉献给广大读者。本文是该专栏的开篇,综述了目前火电厂锅炉炉墙耐火保温材料的性能、使用情况、存在问题和改进措施。
From April 26 to April 28, 1998, the State Power Engineering Construction Bureau and the CEC Business Unit jointly held the “Experience Exchange Meeting of Furnace Walls and Thermal Insulation in Thermal Power Plants” in Wuxi, Jiangsu Province. Meeting discussed the “thermal power plant thermal insulation paint construction enterprise qualification standards” and “on improving the quality of thermal insulation construction project,” the two draft of the draft, at the same time a technical exchange. Meeting received 27 papers, rich in content, high level. This publication intends to be outstanding conference papers selected nine columns, dedicated to the general reader. This article is the opening of the column, summarizes the performance, usage, existing problems and improvement measures of the fire-resistant and heat-insulating materials in the boiler furnace wall of thermal power plants.